Wentzville Emergency Generators
CM Archer assisted the City of Wentzville with design, relocation and installation, of a standby power generation system and testing and training of an existing generator.
Project included existing facility electrical service entrance and load center/panelboards modifications and reconfigurations; temporary facility backup power during critical project service installations; existing generator system inspection, checkout, disassemble, transport, relocate, modify, install and testing and owner training; new automatic transfer switch installation, checkout, testing and Owner training; Existing and new utility metering equipment relocation and or installation; facility grounding system modifications and testing; coordination with local City officials and electrical utility companies, work as required by equipment manufacturers for proper installation and operation; existing and new electrical system conductors, conduit, and terminations; new system local alarming control panel.
Archer also assisted the City with the design, installation testing and training of a new standby power generator system to include existing facility electrical service entrance and load center/panelboards modifications and reconfigurations; temporary facility backup power during critical project service installations; new standby generator system installation, checkout, testing and Owner training; new automatic transfer switch installation, checkout, testing, and Owner training; modify existing utility metering equipment; facility grounding system modifications and testing; coordination with local City officials and electrical utility company; work as required by equipment manufacturers for proper installation and operation; existing and new electrical system conductors, conduit, and terminations.
The project has required a very high level of cooperation with the City of Wentzville and required good coordination between the Engineer and the City of Wentzville Staff.