CM Archer Group











1100 North Outer Road
St. James, MO 65559
Phone: (573) 265.0190 Fax: (573) 265.0193
cmarcher@cmarcher.com
Sanitary Sewer Evaluation Study - Waynesville, Missouri

Company Profile

CM Archer Group, Engineering and Surveying is a multi-disciplined professional services consulting firm offering civil engineering and land surveying for both the public and private sector

Projects


Ashland, Missouri
  • Palomino Ridge Detention Investigation
  • Drainage Projects


  • Barr Engineering
  • Buick Resource Recycling Facility
  • Sweetwater Doe Run


  • Bourbon, Missouri
  • Bourbon High School Retrofit Roof
  • Crawford County R-1 School District Safe Routes to School
  • Water System Improvements


  • Chamois, Missouri
  • Wastewater Treatment Facility


  • Crocker, Missouri
  • Main Street Water Replacement
  • Safe Routes to Schools/Transportation Enhancement
  • Southside Annexation
  • Water Study


  • Cuba, Missouri
  • School Street Improvement
  • Water System Model


  • EDM Incorporated
  • Steelville Electrical Distribution System


  • Edgar Springs, Missouri
  • Wastewater Treatment Facility


  • Fort Leonard Wood, Missouri
  • 4th MEB Staking
  • BCT-III
  • Child Development Center GIS Conversion
  • Digital Training Facility
  • Permanent Party Barracks Phase III
  • Torgeson Electric Telecommunications Duct Bank and Light Standards


  • Fredericktown, Missouri
  • Commercial/Industrial Park
  • Wastewater Conveyance System Improvements
  • Wastewater Treatment Plant Improvements
  • Water System Improvements


  • HDR, Inc.
  • Realty to Roads


  • Hermann, Missouri
  • 10th Street Extension
  • 1Soy Manufacturing Infrastructure
  • 2nd and 10th Street Water Replacement
  • 3rd/Gellert Curb and Gutter (LeRoy)
  • Airport Hanger Elevation Certificate
  • Alco Utilities
  • Alleman Trailer Park Inspection
  • Ambulance Shed Expansion
  • Bavarian Hills Boulevard
  • Bavarian Hills/See Tal Natural Gas and Water Extensions
  • Bohl's Trailer Court
  • Downtown Master Plan
  • Downtown Revitalization
  • East 7th/Gellert Development
  • Electrical Distribution System
  • Epple-Fricke Curb & Gutter
  • Frene Valley Electric
  • The Garten
  • Gateway Plaza
  • Hermann Creamery
  • Hermannoff Bridge Trail
  • Hospital Renovation
  • Hospital Water Well & Ambulance Facility Utility Improvements
  • Hwy. 100/19 Bridge Replacement and Realignment
  • Hwy. 100 Hermannoff Bridge Utilities
  • Industrial Development Authority
  • Katy Trail Connection
  • Moore Gear Utility Relocation
  • Morrison Apparel Infrastructure Design Grant
  • Natural Gas Regulator and Bore Connection
  • Norm's Ice House Utilities
  • Performing Arts Facility
  • Quiet Zone
  • R&J Retail Facility
  • Recreational Trails Grant
  • Reserve Street Drainage
  • Riverfront Monument Lighting & Pavement
  • Sanitary Booster Pump Station Bypass
  • Sanitary Electrical Support
  • Sanitary Sewer Evaluation Study
  • Safe Routes to School
  • Schieffer's Branch Flood Analysis
  • See Tal Ridge
  • Stonehill Winery Utility Relocation
  • Tin Mill Brewery Area Electrical
  • Transportation Enhancement
  • Gaines Construction - Union Pacific Railroad Construction
  • W. 10th Street, Jefferson and Stark Blvd Street Improvements
  • Wastewater System Improvements
  • Water Study
  • West 4th Street Sewer Extension
  • West 5th Street Extension
  • West 18th Street
  • White & Borgognoni Architects German School Topo Survey


  • Iberia, Missouri
  • Municipal Drinking Water System


  • New Haven, Missouri
  • Maupin and Wall Street
  • Miller Street
  • MDNR Storm Grant
  • Street Improvements
  • Sunset Lane
  • Wall Street Improvements
  • Wastewater Collection Improvements and PS5 Replacement
  • Wastewater System Study
  • Water Study


  • Newburg, Missouri
  • Safe Routes to School
  • Sanitary Sewer Improvements
  • Water System Improvements
  • Water System Study


  • Owensville, Missouri
  • City Park Storm Drainage
  • Gasconade County School Lift Station
  • Grimco Industrial Expansion
  • Highway 19/28 Utility Extension
  • Primary Electrical Distribution System Expansion
  • Street Rehabilitation
  • Wastewater Treatment Plant
  • Water System Improvements
  • Water System Improvements Phase I
  • Water and Sewer Improvements Phase II
  • West-Side Industrial Sewer Facility Plan and Improvements
  • William B. Ittner New Owensville Elementary Civil Design


  • Richland, Missouri
  • Sanitary Sewer Evaluation Study Phase 1


  • Rolla, Missouri
  • Briggs and Stratton Addition
  • Circle H Construction Summerfield Subdivision
  • Dairy Queen Reconstruction
  • Empower CES Hydrogen Electrolyzer and Transit Depot
  • FedEX Expansion
  • Gingerbread House Site Planning Rezoning
  • Gingerbread House Site Design
  • Missouri S&T Mine Site Survey
  • Missouri S&T H2 Fueling Station
  • Pebblestone Planned Unit Development
  • Phelps County Regional Medical Center Electrical Engineering Support
  • Rolla West Master Plan
  • Timberline Land Co. Memoryville USA


  • Salem, Missouri
  • Liftstation Design
  • Safe Routes to School
  • Sanitary Sewer Collection System Mapping
  • Sanitary Sewer System Evaluation - Watershed No. 1
  • Sanitary Sewer System Evaluation - Watershed No. 3
  • Sludge Reed Bed System
  • Soccer Field
  • Wastewater Treatment Plant Reed Bed Expansion
  • Water System Model


  • St. Clair, Missouri

  • 30/47 Utility Relocation
  • AB/I44 Trunk Sewer
  • Casablanca Water & Sewer Extension
  • Industrial Development
  • Lagoon Discharge Notice of Violation
  • Rest Area Utilities
  • SCADA Systems
  • Victorian Manor Water and Sewer Extension
  • Wastewater Treatment Plant Capacity Evaluation
  • Water Study
  • Well No. 7 and Wellhouse No. 1


  • St. James, Missouri
  • 2009 ARRA Sidewalk Replacement
  • Investment Realty Bowen Subdivision
  • Investment Realty Finney Property Flood Study
  • Investment Realty Willow Creek Subdivision
  • Macks Point Subdivision
  • North Parker Lane Electric Substation Improvements
  • Parker Industrial Tie Circuit
  • PWSD #4 of Phelps County Wastewater Conveyance System
  • Public Pool Partial Property Boundary and Survey
  • R1 School District Athletic Field Improvements
  • R1 School District Athletic Field Off-Site Drainage Improvements
  • Safe Routes to School
  • Sewer Creek Crossing Repair
  • St. James Outdoor Municipal Swimming Pool
  • Wastewater Treatment Plant


  • St. Robert, Missouri
  • Aquatic Center
  • Bosa/Marshall Drive Drainage Evaluation
  • Community Park Pavilion
  • Dogwood Storm
  • Eastlawn Avenue Reconstruction
  • Eastlawn Water
  • Electrical Services
  • Foxworth Storm
  • Freedom Elementary School Utilities
  • I44 Pedestrian Bridge
  • IP/NV Transportation District Carson Boulevard
  • IP/NV Transportation District Fairfield Bypass
  • IP/NV Transportation District McKinnon Street Design
  • Lentl Lane
  • Liberty Drive Sewer
  • Mainstay Utilities
  • Missouri Avenue Street Light Transportation Enhancement
  • Missouri Avenue Utility Relocation
  • Pedestrian/Bikeway Trail Master Plan
  • Pump Station No. 6 Replacement
  • St. Robert Boulevard
  • St. Robert Boulevard Pedestrian Trail
  • Super 8 Utility Relocation
  • Transfer Station
  • Transportation Master Plan
  • Vickie Lynn Lane Improvements
  • Vortex Design
  • Wastewater Treatment Plant Expansion
  • Water System
  • Water System Chlorination
  • Woodland Hills Forcemain


  • Steelville, Missouri
  • Electrical Distribution System
  • Missouri Engineering Steelville Main Feeder I
  • Steelville Telephone Exchange Mill Spring Estates
  • Steelville Telephone Exchange Storage Structure Elevation


  • Vienna, Missouri
  • WOW Pizza Waterline Extension


  • Waynesville, Missouri

  • Sanitary Sewer System Evaluation
  • Water Tower Location Study
  • Wastewater Treatment Facility Upgrade>


  • Wentzville, Missouri

  • Emergency Generators


  • Village of West Sullivan, Missouri

  • Wastewater Issues Assistance
  • Wastewater System